 |
| Destroyer on display in Albany |
 |
| Big boat traffic passing us while moored in Castleton, just south of Albany |
 |
| Replica of something we passed on the way to Castleton |
We made it to the Castleton Boat Club, spent a few days doing some projects before dropping the mast and several loads of laundry. Dropped the mast early morning on Tuesday the 23rd with help from Ken Bushee and faithful Brittany Spaniel "Skipper". Ken also brought us 2 of the 3 stands we needed and Stan made the 3rd from pieces found at the yard. We secured mast to boat and headed out mid-day for the Federal Lock giving us a lift of about 14 feet, from there we went to the Waterford municipal dock. The main floating dock was full with only one spot left for "Dream Walker". This is a free dock with showers and water available, the last time we were here 2 years ago this Nov. it snowed and everything was closed up because of hurricane Irene. The volunteer staff at the welcome center are great and most helpful with giving you the lay of the land. We enjoyed a nice walk around town, met several cruisers headed south on their adventures.
 |
| Leaving the federal lock in Troy |
We left mid-morning on Wed. to start up the Champlain Canal and transited through the 1st 2 locks with a Canadian boat we met at Castleton (total lift of about 33'). We stopped just before lock 3 at Mechanicville another free municipal lock with water, power and pump-out. My sister Michelle drove down to visit us for dinner on board. Very pleasant evening and watched the fireman practice pumping water through to their ladder truck, fortunately they were downwind.
 |
| Stan working the line as we get lifted in a lock, this is a 2 person job Stan on the stern and I'm at the bow. |
 |
| Stan and Michelle relaxing on the stern, the chairs we had left at Castleton 2 years ago when we realized they did not fit with the split backstays when the mast is up. |
 |
| Mechanicville Fire Dept. practice |
Locks open at 8:00 am so we were knocking at lock 3 door at 8:01 on Thurs. morning and made our way through lock 9 at about 5:30pm. Had several delays today due to a dredging project between locks 5 and 8, lots of barge and work boat traffic.
The Hudson River Dredging Project is a massive environmental cleanup
effort to remove polychlorinated biphenyls (PCBs) from the Hudson River
deposited by a former General Electric (GE) plant located upstream.
This superfund project is intended to remove years of built-up PCB-laden
sediment. GE is handling the cleanup under U.S. Environmental
Protection Agency oversight and the effort is expected to last through
2016. This is the reason you do not eat fish from the Hudson.
Locks 3 through 8 are lift locks for us northbound traffic, total lift of about 92 feet Entering lock 9 at the highest level in the lock system at about 140 feet above sea level. We stopped and tied up on the north wall of lock 9 after being lowered 16 feet. Nice place to spend the night, very quiet at least when the bull frogs went to sleep that is. It has been much cooler and Stan has been putting on several layers of clothing and when I mentioned his nose being red from sun today he said it was "frostbite" I said you are just acclimating and he said no I am just traumatized :-)
Got under way early this morning and entered lock 11 (there is no lock 10) that dropped us 12 feet and made it to the free municipal wall at around 10:30am. We spent most of the day having a detailed tour of Skene Manor that was built in the early 1870's during the hay-days of Whitehall, here is more info
http://www.skenemanor.org/. Then went and found a place to fill our propane tank before the end of the business day near the marina. This evening we enjoyed live music in the park a nice unexpected treat.
 |
| Skene Manor |
 |
| View of Dream Walker on the wall in Whitehall |
 |
| Our tour guide. |
 |
| View from the bell tower at Skene Manor |
 |
| Tourists view of lock 12, we will be going through tomorrow afternoon(Saturday). |
Well to tomorrow we will officially be in Lake Champlain when we get lowered 15' down lock 12. The overall length of the Champlain canal is 60 miles. From there we will probably find an anchorage for a night or 2 before getting Chipman Point Marina to have the mast put back up. Then we will be making our way north visiting some of our old favorite spots and this will be the first time "Dream Walker" will be sailed in the lake since the only time she had been in these waters her mast was always down.
As always stay tuned and take care
Elizabeth